We handle 1,500+ orders a year, about a third from overseas buyers. Reviewing the problem orders, the traps are the same ones over and over. Here are the eight checkpoints — each trap paired with the one question that avoids it. Ask them all and you sidestep 90% of disputes.
① Color variance — ask: "Which light box do you match under?"
A phone-photo color and a factory light-box color are different worlds. Before ordering, fix in writing: the Pantone reference (TCX/TPX), the matching light (D65 or TL84), and the tolerated variance (typically grade 4+). For knits require a yarn lab-dip; for prints a fabric swatch approval — with that in the contract, acceptance arguments end before they start.
② Sampling — ask: "Is the approved sample the acceptance standard?"
A verbally approved sample is not a standard. Require a signed sample confirmation sheet, archived photos both sides keep, and written terms for sampling-fee refunds and free revision rounds.
③ Lead time — ask: "25 days from which milestone?"
The trap is the starting gun: from deposit received, from sample approval, or from contract date — the spread can be two weeks. Also fix the weekly progress-report method, whether you can join a live line-walkthrough at key stages, and the delay remedy written into the contract.
④ Inspection — ask: "Sampling to which AQL?"
The trade standard is AQL 2.5 for regular goods — "factory self-check" below that standard is no inspection at all. Confirm three QC gates (fabric, in-process, finished), that the report ships with the goods, and that third-party inspectors (SGS/Intertek) are welcome on site.
⑤ Export packing — ask: "What's the carton and marking spec?"
Domestic packing sent overseas fails at the port: cartons too weak, no shipping marks, packing lists that don't match. Confirm carton size and bursting strength, palletizing, and that marks (consignee / carton no. / gross-net weight) print to your forwarder's spec.
⑥ Documents — ask: "Which export documents can you issue?"
Commercial invoice, packing list and certificate of origin are the baseline — a formal customs declaration requires the factory's own import/export registration. If you need test reports (marketplace onboarding, retail), confirm upfront that OEKO-TEX or third-party reports ship with the goods.
⑦ Payment — ask: "Deposit/balance split, and in which currency?"
The norm is 30% deposit, 70% against the B/L copy. Be wary of unfamiliar suppliers demanding 100% upfront TT. For larger orders, a letter of credit or escrow service; for small first orders, PayPal or trade-assurance platforms lower the risk.
⑧ After-sales — ask: "How are quality claims settled?"
Discovering defects after arrival is the most powerless moment in the whole trade. Agree before ordering: the claim window (typically 30 days), how faults are determined (mutual or third-party), and the remedy form (replacements / credit / refund). One paragraph in the contract beats three months of argument later.
CHECKLIST
Light source / sample confirmation / lead-time starting point / AQL standard / export packing & marks / document list / payment milestones / claim remedy — get all eight in writing before the deposit.
Go deeper: our six-step process and six guarantees (AQL 2.5, 30-day claims) answer every checkpoint above; certifications on the about page.